To ensure the secure and reliable operation of the WAPP Interconnected System
Funding secured by WB within the framework of CLSG Interconnection project. The service contract related to the synchronisation study and the supervision of the installation of the equipment is ongoing. Measurements have been performed on selected generation units of the WAPP system. The data report has been issued and validated in March 2016. The interim report has been issued and validated in September 2016
WAPP to follow up the study
In service year | 2015 |
Project Cost | 18 |
Funds Secured | 18 |
Funding Sources | WB |