Home > WAPP Integration Project

WAPP Integration Project

31.03.2017 |

Objective

To ensure the secure and reliable operation of the WAPP Interconnected System

Project Status

Funding secured by WB within the framework of CLSG Interconnection project. The service contract related to the synchronisation study and the supervision of the installation of the equipment is ongoing. Measurements have been performed on selected generation units of the WAPP system. The data report has been issued and validated in March 2016. The interim report has been issued and validated in September 2016

Follow up Actions Required

WAPP to follow up the study

USEFULL INFORMATION

In service year 2015
Project Cost 18
Funds Secured 18
Funding Sources WB

Key figures

  • 17 060 020 MWh
    WAPP Consumption Q4 2020
    16 798 772 MWh
    Total Energy generated Q4 2020
  • 10 641 MW
    Peak load Q4 2020
    12 666 MW
    Available Capacity Q4 2020
  • 21 216 037536 MWh
    Hydro Energy Generated 2020

Technical and financial partners