WAPP Integration Project

31.03.2017 |

Objective

To ensure the secure and reliable operation of the WAPP Interconnected System

Project Status

Funding secured by WB within the framework of CLSG Interconnection project. The service contract related to the synchronisation study and the supervision of the installation of the equipment is ongoing. Measurements have been performed on selected generation units of the WAPP system. The data report has been issued and validated in March 2016. The interim report has been issued and validated in September 2016

Follow up Actions Required

WAPP to follow up the study

USEFULL INFORMATION

In service year 2015
Project Cost 18
Funds Secured 18
Funding Sources WB

Key figures

  • 16 721 635 MWh
    WAPP Consumption Q1 2019
    16 480 092 MWh
    Total Energy Generated Q1 2019
  • 11 534 MW
    Peak load Q1 2019
    13 743 MW
    Available Capacity Q1 2019
  • 16 277 037 MWh
    Hydro Energy Generated 2019