WAPP Information and Coordination Centre
About us
News & Events
Contact us
Sitemap
Ecowapp
Pipes
Search form
Search
facebook
twitter
linkedin
goofle
Toggle navigation
Reports of activities
Synchronisation
Market development
ICC projects
Documents & Resources
Reliability
Studies
Analysis
Operational Data
Strategic meetings
Engeneering & operating committee
Distribution & commercialisation committee
Home
>
Documents & Resources
Documents & Resources
Keywords
Start date
Date
E.g., 10.12.2024
End date
Date
E.g., 10.12.2024
Theme
Annex A
Annex B
Annex C
Annex D
Annex E
Consultancy Services & Owner’s Engineer for the Synchronisation of WAPP Interconnected Network
ECOWAS Regional Electricity Market Leaflets
Operation Manual for WAPP Interconnected Power System
WAPP Operation Manual
Transmission Tariff Methodology
OSMP
Regional Market Rules
2020 Report: Reduction of Electricity Losses in the Distribution Companies in the ECOWAS Region
19.07.2022
Download
Approval of the West African Power Pool Transmission Service Access and Use Procedures(WTSAUP)
07.08.2020
Download
Adoption of model bilateral contracts for the supply of power within the framework of the Regional Market
04.04.2020
Download
ECOWAS Regional Electricity Market Participant Application Form
15.08.2019
Download
ECOWAS Regional Electricity Market Participation Agreement
15.08.2019
Download
Approval of the Procedure of Application for Admission in the Regional Electricity Market
15.08.2019
Download
Pages
1
2
›
»
Key figures
85 TWh
WAPP Consumption 2022
28 TWh
Total Energy generated Q2 2023
14 GW
Peak load Q3 2023
14 GW
Available Capacity Q3 2023
26 TWh
Hydro Energy Generated 2022
Technical and financial partners