Home > Strategic meetings > Engeneering operating committee

Engeneering operating committee

  • Data Collection CIE
    Comité de Distribution et de Commercialisation (CDC)
  • Report on 13th Meeting of Engineering and Operating Committee
    The West African Power Pool (WAPP) General Secretariat organised the thirteenth meeting of the Engineering and Operating Committee (EOC) of the WAPP at Cotonou, Benin from 3rd to 5th October 2016

Key figures

  • 85 TWh
    WAPP Consumption 2022
    28 TWh
    Total Energy generated Q2 2023
  • 14 GW
    Peak load Q3 2023
    14 GW
    Available Capacity Q3 2023
  • 26 TWh
    Hydro Energy Generated 2022

Technical and financial partners