Engeneering operating committee

  • Data Collection CIE
    Comité de Distribution et de Commercialisation (CDC)
  • Report on 13th Meeting of Engineering and Operating Committee
    The West African Power Pool (WAPP) General Secretariat organised the thirteenth meeting of the Engineering and Operating Committee (EOC) of the WAPP at Cotonou, Benin from 3rd to 5th October 2016

Key figures

  • 16 702 764 MWh
    WAPP Consumption Q4 2017
    16 515 533 MWh
    Total Energy Generated Q4 2017
  • 10 447.6 MW
    Peak load Q4 2017
    12 535 MW
    Available Capacity Q4 2017
  • 16 277 037 MWh
    Hydro Energy Generated 2017