Home > Strategic meetings > Engeneering operating committee

Engeneering operating committee

  • Data Collection CIE
    Comité de Distribution et de Commercialisation (CDC)
  • Report on 13th Meeting of Engineering and Operating Committee
    The West African Power Pool (WAPP) General Secretariat organised the thirteenth meeting of the Engineering and Operating Committee (EOC) of the WAPP at Cotonou, Benin from 3rd to 5th October 2016

Key figures

  • 17 060 020 MWh
    WAPP Consumption Q4 2020
    16 798 772 MWh
    Total Energy generated Q4 2020
  • 10 641 MW
    Peak load Q4 2020
    12 666 MW
    Available Capacity Q4 2020
  • 21 216 037536 MWh
    Hydro Energy Generated 2020

Technical and financial partners