Back Up Facility for ICC

31.03.2017 |

Objective

To ensure non-interruption in the functionality of the WAPP ICC

Project Status

At the level of conception

Follow up Actions Required

WAPP to mobilize financing to implement

USEFULL INFORMATION

In service year 2019
Project Cost 7
Financing Gap 7

Key figures

  • 17 060 020 MWh
    WAPP Consumption Q4 2020
    16 798 772 MWh
    Total Energy generated Q4 2020
  • 10 641 MW
    Peak load Q4 2020
    12 666 MW
    Available Capacity Q4 2020
  • 21 216 037536 MWh
    Hydro Energy Generated 2020