Back Up Facility for ICC

31.03.2017 |

Objective

To ensure non-interruption in the functionality of the WAPP ICC

Project Status

At the level of conception

Follow up Actions Required

WAPP to mobilize financing to implement

USEFULL INFORMATION

In service year 2019
Project Cost 7
Financing Gap 7

Key figures

  • 16 702 764 MWh
    WAPP Consumption Q4 2017
    16 515 533 MWh
    Total Energy Generated Q4 2017
  • 10 447.6 MW
    Peak load Q4 2017
    12 535 MW
    Available Capacity Q4 2017
  • 16 277 037 MWh
    Hydro Energy Generated 2017