The West African Power Pool (WAPP) was established in 1999 by Economic Community of West African States (ECOWAS) countries members to promote regional energy integration. The project’s general objective is “to design and develop an electricity market for the West Africa Power Pool”.

Key figures

  • 85 TWh
    WAPP Consumption 2022
    28 TWh
    Total Energy generated Q2 2023
  • 14 GW
    Peak load Q3 2023
    14 GW
    Available Capacity Q3 2023
  • 26 TWh
    Hydro Energy Generated 2022