Objective

To reinforce the WAPP data and telecommunication infrastructure in the medium term.

Project Status

To complete the telecommunication infrastructure to allow a fully secured communication (with back-up) between the ICC, the CAC and the NCC

Follow up Actions Required

WAPP to prepare a review of the actual data and telecommuncation infrastructure

USEFULL INFORMATION

In service year 2016
Project Cost 41
Financing Gap 41

Key figures

  • 85 TWh
    WAPP Consumption 2022
    28 TWh
    Total Energy generated Q2 2023
  • 14 GW
    Peak load Q3 2023
    14 GW
    Available Capacity Q3 2023
  • 26 TWh
    Hydro Energy Generated 2022