West African Power Pool (WAPP) - Information and Coordination Centre (ICC)
WAPP-ICC will serve as the central monitoring and electricity trading hub. By supporting the construction of the WAPP Information and Coordination Centre (ICC), the project will provide ECOWAS the means to effectively coordinate data exchange with other Control Area Centres (CACs). It will enhance a reliable and secure operation of the Interconnected Power Systems.
The ICC Project involves the construction and equipping of the ICC building in Calavi, Republic of Benin.
Collect, analyse and disseminate
Collect, analyse and disseminate the information needed to gauge the evolution of interconnected electricity generation and transmission systems in the region
Monitoring
Monitor the development of the national electric power sector in ECOWAS Member States in order to forewarn the risks of performance deficiencies and to provide them with corrective measures
Analyse the visibility
Periodically analyse the economic and technical viability of cross-border electricity trading arrangements among Transmission Using Members
Facilitate the development
Facilitate the development of technical norms and standards for the collection and treatment of useful information for the efficient operation of the national and interconnected networks
Support
Support and monitor the technical performance of the electricity utilities
Publish and distribute
Publish and distribute printed reports as necessary
Develop and maintain
Develop and maintain electronic databases of relevant technical information as approved by the Executive Board.